MAKESHIFT RUNWAY
AREA OF OPERATIONS: Classified
DATE: 06-15-04
TIME: 0825 hours
(Skydive attempts to repair the external, electric engine control module (E3CM) of the Sky Sharc back within operational parameters.)
(Airborne inspects the target acquisition/pilot vision system.)
(Skydive comments on the Sky Sharc to Airborne.)
(A Steel Brigade trooper configures a Radar Rat for automated scanning.)
Page 2
|