|
MAKESHIFT RUNWAY
AREA OF OPERATIONS: Classified
DATE: 06-15-04
TIME: 0825 hours

(Skydive attempts to repair the external, electric engine control module (E3CM) of the Sky Sharc back within operational parameters.)

(Airborne inspects the target acquisition/pilot vision system.)

(Skydive comments on the Sky Sharc to Airborne.)

(A Steel Brigade trooper configures a Radar Rat for automated scanning.)
Page 2
|