|
COBRA ARTILLERY SETUP
AREA OF OPERATIONS:
DATE:
TIME: 1314 hours
DESCRIPTION:
Metal Head oversees a group of Cobra Infantry Troopers in setting up a prototype
artillery piece purchased from M.A.R.S.

(Two Infantry Troopers
struggle to remove a control panel that was installed incorrectly.)

(Metal Head watches as a Squad Leader directs Infantry Troopers.)

(Two
Techno-Vipers unload equipment to correctly install the artillery control seat
and console.)

(Two Laser Vipers run through
check-ups on a F.A.N.G. II that Dissent is piloting to lift the deflector
section of the Interlocker.)
Page 2
Page 3
Page 4
|